Case Study

Global FTSE 100 Company Top Floor Top Floor Refurbishment

Client

Global FTSE 100 Company Top Floor

Timeframe

23 weeks

Size

95,000 sq ft

Location

Hertfordshire

circle

Our client, a Global FTSE 100 specialising in emission control technologies, needed assistance from the onset of their project – to completely refurbish their original HQ building in Hertfordshire.

Following initial meetings and in the face of regional and national competition, we quickly identified that this client needed our Discovery approach – to collect the necessary evidence before embarking on a design for their space.

Working alongside the project lead as consultants, we worked with stakeholders and staff to identify the key drivers behind this project. As part of our discovery phase we analysed: – staff profiles, carried out space occupancy studies, identified meeting room usage and looked at storage audits. Finally, we analysed predicted growth over the next 5 years in order to build a clear picture of what shape the design process needed to follow.

As a result of our shape process, the results combined as a complete D&B project involving extensive refurbishment works to the existing building fabric. This included re-roofing the building, strop out and new M&E systems throughout and replacement of circa 350 windows in the building. Several floors were then fitted out in phases – whilst the staff were re-located floor by floor and the building was kept fully functioning throughout the fitout to minimise disruption.

We have created a workplace strategy for our clients as a result of our unique discover, shape, create process – which has taken the culture, productivity and staff experience that work within this office to an incredible new level.

This Project Included:

  • Officescape unique Discover, Shape, Create process
  • Complete design and build solution
  • Core and shell refurbishment
  • New ceilings, flooring, wall linings
  • Complete LED Lighting scheme with feature design “light blades” throughout
  • Glazed partitioning with bespoke manifestations
  • Installation of the largest current UK installed solar controlled HVAC systm
  • Bespoke joinery and upholstery
  • Corporate signage and graphics
  • Living wall
  • Furniture design, build and installation inclusive of bespoke built railway carriages and cocoon seating
  • Full installation of all AV technology and wireless presentation packages in meeting rooms, including meeting room booking systems
  • Full M&E design and install
circle pointer

Get in touch with us

Contact us to find out more about our unique company culture, and why we could be the ideal partner for your next office relocation or refurbishment.

Please complete the form and we’ll call you or, if you prefer, simply call us on 01553 811833 or email info@officescapellp.co.uk and we’ll be pleased to help.

Contact Form
Sending