With 2015 only just underway, we have 5 London fit out projects started already. Next week, we’ll be starting work in Cambridge on another. This one in Cambridge is a full design and refurbishment . The redecoration includes new furniture, carpet tiles, solid and glazed partitions. The picture shows the initial construction of an entrance at the top of the stairwell. This office refurbishment project will take 4 weeks to complete.
Note we already have hse in place with first aid point and No Radios!
This plan shows the design option with detail of the feature floor finish.
If you would like us to inspire you with your office redesign and fit out contact us on 01553 811833 or by email for a no obligation discussion.